The scope of the project included the preparation of a BIM model based on 2D documentation at the level of detail LOD 400. The resulting model was used to check the documentation and the subsequent production of panels based on the resulting model.
3D BIM model helped avoid costly collisions so that the panels that arrived on site were ready for assembly.
about the project

CLIENT
PLACE

DUBLIN
STARTING YEAR
2019

PROJECT ARCHITECT


MAIN CONTRACTOR
INVESTMENT BUDGET
EUR 1.7 BILLION

22 189
STONE CLADDING PANELS
2 704
STEEL BRACKETS
509
STEEL LINTELS
272
FIRE BARRIERS